![]() |
|
![]() |
![]() |
![]() |
|
![]() |
|
![]() |
|
Client
Heritage Enterprises
Location
Minonk, Illinois
Building Type
Single Story Nursing Home Facility
Time Frame
May 1, 2011
Objective(s)
The goal was to update the chiller system
Findings
(Type of System) Chilled Water
(Age of Condition of System) 31 years old
(System Problems) Age, Leaks, Reliability
(System Efficiency) Fair Considering Age
Solution(s)
We replaced the R-22 reciprocating chiller with a R-410A high efficiency scroll chiller with microprocessor-based controls
Result(s)
The system's efficiency increased by 10-20% annually. The microprocessor allows for chilled water temperature reset, further increasing efficiency.